Nexen Tire’s first tire plant in Czech with capacity of 16,000 tires produced per year has been completed August, 2019. The master plan consists of 4 phases of construction considering future expansion to reach tire production capacity up to 60,000 per year. All production line is equipped with a state-of art automated system, which is developed on the basis of the existing automated system applied in the existing plant in Changnyeong, South Korea.
Client
NEXEN Tire
Location
Zatec, Czech Republic
Site Area
654,000.00
Floors
B2, 5F
Program
Automotive & Mobility
Gross Floors
123,000.00
Structure
SC, RC, PC